  1. V8
    10,794 Posts.
    lightbulb Created with Sketch. 204
    I suppose if you read the last 3 anns in quick succession it all addds up, it does seem to have taken quite a long time to clean up this well however.

    In my experience you will usually get a flow result after 2 weeks of well clean up, we've been waiting 4 !!!

    But on a positive note if their was formation water egress into the well they would know that by now so given the price hasnt crashed and they havnt ann'ed such an event it may not be happening


    August 10, 2011
    Warro-4 Flow Testing Set to Commence
    ? Testing of Warro-4 well imminent, following successful stimulation program
    ? Representative flow rates expected within weeks
    ? Field has estimated resource of 8-10 Tcf Gas in Place

    Transerv (ASX: TSV) is pleased to confirm that preparations are underway for flow testing of the Warro-4 well following the successful reservoir stimulation program earlier this month.
    This program is designed to confirm the commercial potential of the Warro onshore gas field in WA.
    A coiled tubing unit was used at the weekend to successfully remove the sand plug from the Warro-4 well bore, with the unit released from site on Monday. Operations have now moved to well completion activities that are expected to be completed this week, and will be immediately followed by an extended flow testing program.
    Following the well completion activities, it will take approximately 2 weeks to recover the water used in the stimulation operations, at which time a representative gas flow rate can be achieved from testing.


    August 24, 2011
    Warro-4 Flow Testing to Commence
    ? Well completion equipment in place
    ? Warro-4 flow testing imminent
    ? Representative flow rates expected within weeks
    ? Field has estimated resource of 8-10 Tcf of gas in place

    Transerv Energy (ASX: TSV) is pleased to advise that it is set to commence flow testing the Warro-4 onshore gas well in WA after successfully running the completion equipment in the well.
    Well clean-up operations are underway and will initially focus on flowing gas from both stimulated zones until a
    substantial proportion of the fluids injected into the reservoir through the stimulation program have been recovered and a sustained gas flow is achieved.


    September 7, 2011
    Warro-4 Flow Testing Update
    ? Warro-4 well clean up continuing; flow testing expected shortly
    ? Commercial potential of Warro field expected to be known within weeks
    ? Field has estimated resource of 8-10 Tcf of gas in place

    Transerv Energy (ASX: TSV) advises that the well clean up operations to remove the slick water used in the reservoir
    stimulation process of the Warro-4 gas well are significantly advanced, with the flow testing program expected to commence shortly.

    Once sufficient slick water is recovered from the reservoir, a sliding sleeve will be used to close off the upper zone (zone six) to commence an extended gas flow test of the lower stimulated reservoir section (zone four).
 