could be according to last ASX release:
The percussion drilling program is designed to:
a) Investigate ground water flows to satisfy requirements in respect to the preparation of the mining proposal; and,
b) Complete infill drilling within the ore body to establish greater confidence in the ore zone.
The diamond drilling program is designed to:
a) Provide core to assist in the geotechnical pit design required by the DMP in respect of the mining proposal; and,
b) Provide samples for additional metallurgical test work.
A mine surveyor will be engaged to survey all drill collars. This survey will be completed immediately after concluding the percussion and diamond drill programs.
The current programme will enable an independent mining consultant to complete a revised JORC ore reserve statement.
that was 25 June
- Forums
- ASX - By Stock
- BCN
- was up ? 7 mill traded
was up ? 7 mill traded, page-4
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BCN (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $86.40M |
Open | High | Low | Value | Volume |
2.4¢ | 2.4¢ | 2.3¢ | $13.67K | 582.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 3027392 | 2.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.4¢ | 3070276 | 10 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 3027392 | 0.023 |
11 | 5452038 | 0.022 |
11 | 3414353 | 0.021 |
7 | 4139507 | 0.020 |
2 | 46368 | 0.019 |
Price($) | Vol. | No. |
---|---|---|
0.024 | 2919165 | 8 |
0.025 | 1441945 | 3 |
0.026 | 2657108 | 4 |
0.027 | 349333 | 2 |
0.028 | 2146150 | 1 |
Last trade - 16.10pm 18/10/2024 (20 minute delay) ? |
Featured News
BCN (ASX) Chart |