GDN 0.00% 1.7¢ golden state resources limited

washover pipe

  1. 3,493 Posts.
    lightbulb Created with Sketch. 1
    You wont like this. What has happened is one giant stuff up. First they have Cemented the drill pipe in the well, this means that the Cement that should be on the out side of the casing is on the inside. I am sure they now will have to perforate the casing and then pump cement in to the out side. I would say this will take up to three weeks at least. This is a normal day at the rig, don't worry, the gas is still down the well.
 
watchlist Created with Sketch. Add GDN (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.