ROG red sky energy limited.

"watch this space" 1 year ago?, page-2

  1. 1,272 Posts.
    lightbulb Created with Sketch. 573
    The magic Number is 250,

    I'm focused on 250. That’s it. Just 250 barrels a day and Red Sky flips from loss to profit. Simple line, massive shift. Hit that number and everything changes. Killanoola’s got oil, on low estimates there is 29m/barrels and a high estimate of 157m/barrels. That’s not a debate, it’s bloody well proven! But it’s not flowing easy. We need to clean up the wells, optimize flow by acidizing, sidetrack, by branching off into a clean wellbore. It’s not rocket science, hydrochloric acid, and some solid planning. Doesn’t break the bank.

    But it’s not just about money. It’s about permits, to push it forward. We need to stop dragging our feet and lean on the Department for Energy and Mining to move faster. Because if they don’t? Chalk up another small-cap buried by red tape due to unnecessary environmental bullshit (just another toll paid to government for nothing). This isn’t about luck. It’s about execution. The oil’s right there, under our feet. The strategy’s clear. Hit 250, and we stop the bleeding. Sentiment shifts, confidence builds, and suddenly, that ticker’s worth watching again, because right now, I'd rather not think about it.

    I have looked at similar projects online and to clear up a 1000 metre long (maybe less) shaft would require 10 to 15% HCI with water to clear every ten metres of line.
    So, 1000 liters of pure acid solution (yeah you heard) 2x IBC containers at a whopping cost of $400 dollars each plus shipping. I don't know the wellbore diameter (something else not explained) but going off similar casing programs like AXP; but they will introduce the HCI inside a corkscrew to break up solidification, personally I just run a new boreline it would probably work out the same cost without all the red tape from greedy unsympathetic slow to respond government we are going through right now.

    Surface casting is 245mm
    Intermediate round the 178mm
    and Prod casting 140mm

    I would imagine without a hands on, boots on the ground ROG employee to oversee things it will take way longer if everything we do is done by contractors who rightfully wouldn't give a pinch of poop if it's done right or not, as long as they are paid. BOD you cannot run this type of operation sitting in a boardroom all day or at least the days you do come in from a work-at-home week in front of the tv. Again, NO detailed information if you do or dont have your own guy so I'm left to make my own assumptions, sorry.

    Wildcat 250 is a good call sign.
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $21.68M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $1.64K 409.9K

Buyers (Bids)

No. Vol. Price($)
54 91547031 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 42743444 37
View Market Depth
Last trade - 09.59am 28/07/2025 (20 minute delay) ?
ROG (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.