I also do not have the data on the volumes of H2O required by the PRL process. Hopefully the details off energy required and H2O required per kg of Hydrogen produced will be provided by management soon.
Found this in the announcement from 02/03/2021...
https://www-provinceresources-com.filesusr.com/html/ba2a36_1ec7a07da15c1734f974afe467e5af7d.html#
• Water, potential site to extract sea water for
electrolyser plant.
• Water, covers least saline and highest
potential area of the world class Birdrong
Aquifer if used as alternate water source.
Cheers Emma
- Forums
- ASX - By Stock
- PRL
- Watch this space for more
Watch this space for more, page-45
-
- There are more pages in this discussion • 61 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PRL (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $48.44M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
PRL (ASX) Chart |
Day chart unavailable