Yes @emmar the capex will be a big consideration for this project. I believe that Total Eren is going to finance the total cost of the renewable energy plant as part of its commitment should the deal proceed. Then the cost for the hydrogen production plant will be shared equally between PRL and Total Eren.
- Forums
- ASX - By Stock
- Watch this space for more
Yes @emmar the capex will be a big consideration for this...
-
- There are more pages in this discussion • 38 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PRL (ASX) to my watchlist
(20min delay)
|
|||||
Last
4.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $48.44M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
PRL (ASX) Chart |
Day chart unavailable
The Watchlist
BM8
BATTERY AGE MINERALS LTD
Nigel Broomham, CEO
Nigel Broomham
CEO
Previous Video
Next Video
SPONSORED BY The Market Online