RED 4.82% 39.5¢ red 5 limited

My understanding is that the 'silting up' you point are high...

  1. 93 Posts.
    lightbulb Created with Sketch. 25
    My understanding is that the 'silting up' you point are high parts deliberately there. The ponds were designed for the water to flow through a series of esses like a snake. The flow rate would drop and the silt would be mostly in the early cells. At the top of the picture every second causeway should have a break and at the bottom of the pic there should be a causeway every second one.

    Some 'numnut; decided to take the esses out and allow the water to flow straight through. I think this was done to make it easier for an excavator to get out to the causeways to desilt and never returned to original condition.

    The end result is the same as HoM points out and that is that there is little to no desilting being done with this feature.
 
watchlist Created with Sketch. Add RED (ASX) to my watchlist
(20min delay)
Last
39.5¢
Change
-0.020(4.82%)
Mkt cap ! $2.686B
Open High Low Value Volume
40.5¢ 41.0¢ 39.0¢ $9.181M 23.04M

Buyers (Bids)

No. Vol. Price($)
34 1243803 39.0¢
 

Sellers (Offers)

Price($) Vol. No.
40.0¢ 139143 5
View Market Depth
Last trade - 16.10pm 25/07/2024 (20 minute delay) ?
RED (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.