'Wave Hub is installing cables into four designated development berths which make it the world’s largest advanced facility for pre-commercial testing of wave energy device arrays.'
One of which belongs to CWE. All that will be missing is a Ceto 6 to plug in and play.
http://renews.biz/102034/wave-hub-signs-on-eta-connect/
Add to My Watchlist
What is My Watchlist?