Fair enough. There is dissent. what you wrote about US Army Corps of Engineers environmental survey wasn't exactly truthful, was it.
You're not reading the environmental reports. Going back to 2019. The US Army Corps of Engineers do the environmental surveys in the US. PLL have failed to demonstrate that their operations won't adversely affect the streams and other waterways. Surprising how all the up rampers here pretend these issues don't exist. They are basically wanting to dump dredged waste into the waterways. DYOR!
- Forums
- ASX - By Stock
- PLL
- We forgot to get our permits
We forgot to get our permits, page-180
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
20.0¢ |
Change
-0.005(2.44%) |
Mkt cap ! $82.08M |
Open | High | Low | Value | Volume |
20.0¢ | 20.3¢ | 19.5¢ | $367.1K | 1.840M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 215653 | 19.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
20.5¢ | 169345 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 215653 | 0.195 |
11 | 308739 | 0.190 |
7 | 443703 | 0.185 |
6 | 598332 | 0.180 |
4 | 420008 | 0.175 |
Price($) | Vol. | No. |
---|---|---|
0.205 | 169345 | 7 |
0.210 | 628904 | 9 |
0.215 | 227638 | 5 |
0.220 | 225063 | 9 |
0.225 | 198020 | 8 |
Last trade - 16.10pm 11/10/2024 (20 minute delay) ? |
Featured News
PLL (ASX) Chart |