Dont think there's anything new to tell the mkt until they hit TD at 2826m, run completion logs & finalise the zones to test.
At that juncture, ENI could plan on running a 7" liner which requires perforation or a run a slotted liner, their call.
For now though, the top 3 zones remain safely behind the 9" casing.
So, assuming all's going well with weather & operations they should finish drilling the last 317m at CL1-ST1, tripping & logging by early Monday at the latest & then plan ahead on testing middle of nxt week.
Left field event here could b more dramas with over-pressure zones, well control, weather which may delay proceedings.
NEN Price at posting:
29.7¢ Sentiment: Hold Disclosure: Held