AAR 0.00% 7.1¢ astral resources nl

website update on koongie

  1. 1,598 Posts.
    lightbulb Created with Sketch. 42
    Some new information appears this afternoon on the AAR website. It's worth a read.

    http://www.anglo.com.au/koongie.asp

    An very small extract below:

    Time Line

    Time lines to development of the Koongie Copper Zinc Project are dependant on ongoing positive results from Scoping and Feasibility Studies, board approval, access to adequate financing, DMP approval and a favourable commodity prices. Potential time line scenario:

    December 2010: Completion of Scoping Study and Sandiego Pit Optimisation

    January 2011: Financing of Feasibility Study

    February 2011: Commencement of Feasibility Study. This will include completion of Flora and Fauna Survey, water study, detailed examination of processing options, and commencement of documentation required for mining approval etc.

    March 2011: Commencement of Open Pit Resource RC and diamond drilling program. This will include large diameter Core drilling to obtain bulk samples for metallurgical testwork.

    April/May 2011: Commencement of Exploration drilling program on targets outside of Sandiego.

    July 2011: Submission of a mining proposal to the DMP.

    Mid to Late 2012: Commencement of Plant construction and pre-strip of Sandiego Open Pit
 
watchlist Created with Sketch. Add AAR (ASX) to my watchlist
(20min delay)
Last
7.1¢
Change
0.000(0.00%)
Mkt cap ! $66.39M
Open High Low Value Volume
7.1¢ 7.1¢ 7.1¢ $6.956K 98.35K

Buyers (Bids)

No. Vol. Price($)
1 7300 6.9¢
 

Sellers (Offers)

Price($) Vol. No.
7.1¢ 49749 1
View Market Depth
Last trade - 16.10pm 07/08/2024 (20 minute delay) ?
AAR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.