There is if those signups want to get a jump with prep design and testing work done and so be able to hit the ground running when that fab ramps up, and you can be sure they will already have had talks with that fab.
They want reram now.
- Forums
- ASX - By Stock
- Weebit - 2024 and beyond
There is if those signups want to get a jump with prep design...
-
- There are more pages in this discussion • 358 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add WBT (ASX) to my watchlist
|
|||||
Last
$2.31 |
Change
-0.010(0.43%) |
Mkt cap ! $436.3M |
Open | High | Low | Value | Volume |
$2.32 | $2.35 | $2.30 | $611.1K | 262.8K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 29735 | $2.31 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$2.33 | 2938 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 27510 | 2.310 |
9 | 84784 | 2.300 |
9 | 59007 | 2.290 |
7 | 20713 | 2.280 |
7 | 43440 | 2.270 |
Price($) | Vol. | No. |
---|---|---|
2.330 | 2938 | 1 |
2.350 | 12358 | 1 |
2.360 | 12000 | 2 |
2.400 | 2932 | 2 |
2.450 | 5120 | 2 |
Last trade - 16.10pm 26/07/2024 (20 minute delay) ? |
Featured News
WBT (ASX) Chart |