Another for this week is KAR which has been delayed due to...

  1. 9,111 Posts.
    lightbulb Created with Sketch. 908

    Another for this week is KAR which has been delayed due to weather during drilling Poseidon-2 well just at the pointy end of things. If confirmed and a gas discovery and flow testing is required could expect to test upside targets, including gap to $10 and $11 band of resistance from previous highs. A positive flow rate would look at +$12 levels.

    kar

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.