CJO - FA - long
I like the 'Fat Prophets Mining' story on CJO. Mkt cap is $82M. Recent cap raising was successful. Gold and silver mine development at Cerro De Gallo in Mexican silver belt. Recent report in Australian - business section on 26/09/12.
October might be the month for decisions.
refer to
http://hotcopper.com.au/post_single.asp?fid=1&tid=1842394&msgid=10737272
and to quote Mr Positive on Hc:
"The independently assessed Feasibility clearly
demonstrates the Stage 1 heap leach as
commercially robust, delivering: 94,600oz Gold
equivalent per year, over 7.2 years life of mine, at
an operating cost of $516 per oz Gold equivalent
(co-product basis).
This ranks Cerro del Gallo Stage 1
among the lowest cash cost gold/
silver production assets proposed
for construction by Australian or
Canadian listed gold companies at
the time of writing.
The benefit of such a low operating cost: a
US$181M Net Present Value (NPV) (6% discount)
after capital pay back, including royalties and
sustaining capital costs, at assumed long term
US$1,341 gold and US$25.58 silver pricing; with
Stage 2 having the potential to extend mine life to
14 years and add significantly to NPV."
- Forums
- ASX - Short Term Trading
- weekend stt lounge 28 -30th sept
CJO - FA - longI like the 'Fat Prophets Mining' story on CJO....
-
-
- There are more pages in this discussion • 29 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)