RNE 25.0% 0.3¢ renu energy limited

(A temporary suspension plug that was placed in the well to...

  1. 302 Posts.
    lightbulb Created with Sketch. 9
    (A temporary suspension plug that was placed in the well to enable installation of the surface valves has failed to set correctly and operations to recover it using drill pipe are underway. While this was an unplanned event,
    contingency plans were in place and it is expected to be a routine recovery operation, unfortunately delaying completion by around a week.)

    Is this what happened at Habanero 2
 
watchlist Created with Sketch. Add RNE (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.