JPR jupiter energy limited

29 January 2010Weekly Drilling Update on J-50 Exploration Well...

  1. 3,668 Posts.
    lightbulb Created with Sketch. 98
    29 January 2010
    Weekly Drilling Update on J-50 Exploration Well (SV Akkar)
    The Board of Jupiter Energy Limited (ASX: JPR) is pleased to provide its weekly
    update report on the drilling of the J-50 Exploration Well (referred to in previous
    announcements as SV Akkar).
    J-50 reaches 1551m in 216mm hole before drilling ahead to core the
    primary Middle Triassic target.
    1. Well Name / Permit: J-50, Block 31, Mangistau, Kazakhstan
    2. Reporting Period: The period to 1200hrs 28 January 2010 (GMT +5)
    3. ASX Release Time and
    Date:
    0700 hrs 29 January 2010
    4. Report No: 4
    5. Spud Date: 2330hrs, 29 December 2009 (GMT +5)
    6. Rig: Astra Star Rig #1 (Turnkey Contract)
    7. Days Since Spud: 29.52
    8. Location of Well: Latitude: 43?46'43.8" N
    Longitude: 51?50'0.78" E WGS 84
    9. Elevation: G.L. 145m MSL
    R.T. 150.5m MSL
    10. Proposed Depth: 3200 - 3300 metres
    11. Target(s): Primary Objective: Middle Triassic at approximately
    2920mRT.
    Secondary Objective: Nil
    12. Present Depth: At 1200hrs 28 January 2010 (GMT +5) depth was
    1551mRT.
    13. Current Geological
    Section:
    Lower Cretaceous dolomites and limestone.
    14. Operations since last
    Report:
    Changed out and tested BOP. Installed surface
    equipment. Made up 216mm BHA. Ran in hole.
    Drilled out cement. Conducted FIT. Drilled 216mm
    hole to 1507mRT. Conducted wiper trip, pulled out
    of hole and retrieved survey tool. Drilled 216mm
    hole to 1532mRT.
    15. Current Operations: At 1200 hrs 28 January 2010 (GMT +5), current
    activity was drilling ahead in 216mm hole section at
    1551mRT.
    16. Future Operations: Drill 216mm hole to 2500m and run intermediate
    wireline logs. Drill ahead to core point in reservoir,
    cut 18m core.
    17. Well/Prospect
    Description:
    This well tests the primary Middle Triassic objective
    in a structural horst trap
    immediately on trend with the oil producing North
    Akkar Field. This location tests a play with an
    estimated 20 mmbbl recoverable mapped within
    Block 31.
    18. Participants in well: Jupiter Energy Limited ? 100%
    If shareholders have any questions on this announcement they should direct
    them to JPR Managing Director, David Thorpe, on (08) 9322 8222.
    ENDS
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
3.0¢
Change
0.000(0.00%)
Mkt cap ! $38.42M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 52552 1.9¢
 

Sellers (Offers)

Price($) Vol. No.
3.5¢ 100000 1
View Market Depth
Last trade - 16.21pm 19/09/2025 (20 minute delay) ?
JPR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.