The old fake news factory at it again.Telling part of the story...

  1. 35,275 Posts.
    lightbulb Created with Sketch. 4
    The old fake news factory at it again.

    Telling part of the story in order to suit their denialist agenda.

    Funny how the serial fake news poster left out the crucial part of the story, isn't it ?

    The reality is that windfarm is being upgraded with bigger better turbines because the technology is improving that quickly.

    Unlike fossil and nuclear where old technology is locked in for 40 years, resulting in us being stuck with very unreliable power stations like Liddell, Hazelwood and Yallourn. Or even new ones like Callide in Qld.

    One of the many advantages of renewable generation is that it can be upgraded smoothly and progressively as technology allows.

    " Repowering of the Aragonne wind project includes replacing the existing 90 turbines with new wind turbines to increase performance and reliability.

    The Aragonne wind project began operations in 2006 and is powered by 90 of Mitsubishi’s 1MW turbines. "

    https://www.nsenergybusiness.com/news/ge-turbines-two-wind-farms-235mw-capacity/

 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.