ZMM 0.00% 1.5¢ zimi limited

wells only expected to flow at 75 mcf, page-13

  1. 308 Posts.
    Billt5,

    The 600-1000 mcfd would only be the absolute open flow rate. There is a very important difference between this and production rates under pipeline pressure! AKK state they are only aiming for 150-200 mcfd STIMULATED production rates. If you are expecting more you will be dissapointed. In comparison it looks as if WHN are quoting expected production rates, much more useful than sensationalist absolute open flow rates.. 75 mcfd is a nice conservative PRODUCTION rate. Multiply 75 mcfd by 100 wells (estimated cost ~$12M) and the production rates will be ~7.5 mmcfd which at $10 mcfd for gas is $75,000 per day for 10-20 years.
 
watchlist Created with Sketch. Add ZMM (ASX) to my watchlist
(20min delay)
Last
1.5¢
Change
0.000(0.00%)
Mkt cap ! $1.9M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 90000 1.1¢
 

Sellers (Offers)

Price($) Vol. No.
1.5¢ 136238 2
View Market Depth
Last trade - 16.12pm 29/07/2024 (20 minute delay) ?
ZMM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.