ZMM 0.00% 1.0¢ zimi limited

wells only expected to flow at 75 mcf, page-5

  1. 159 Posts.
    If you go through announcement WHN is planning to build more wells and each well will cost them around 150k.

    They have mentioned that Further cost will be funded by revenue generated by existing wells. So even if the flow rate are less its just temporary till new wells are drilled.

 
watchlist Created with Sketch. Add ZMM (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.