Points are.
Not easy to offload boats "heaving" up to 3 metres.
Dangerous for seamen on the boat , hard for the crane driver chasing the lift.
Would have been very trying during rig preloading operation also.
To do it safely takes the time needed.
We all want oil but we dont want accidents.
I would appreciate TPT management advising the ASX of operational status.
To that end I have sent an email via the TPT website.
Cheers IFINO