SRR 3.23% 3.2¢ sarama resources ltd

• Preliminary Economic Assessment (“PEA”): Sarama completed a...

  1. 85 Posts.
    lightbulb Created with Sketch. 11
    • Preliminary Economic Assessment (“PEA”): Sarama completed a substantial block of work supporting
    the NI 43-101 compliant PEA for the Company’s Sanutura Project. The scheduled completion date for the
    PEA was anticipated to be late H1, 2023, however due to the availability of technical consultants and
    Qualified Persons to sign off on the report, this has now moved to the middle of H2, 2023.
 
watchlist Created with Sketch. Add SRR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.