Which is why it may have been optimal to drill and wireline incrementally as you go down? For example drill PA, UA and then LA in three distinct phases and wireline after each, before drilling on? Even if it takes longer, and "costs more"? About the current sidetrack, I still don't understand is why drill the entire section of sidetrack instead of making it a "game of two halves" and drill (say) half, wireline that top section then drill on and wireline the bottom "half" (for example)? I have heard it takes linger or costs more but is that not what we need now to de-risk the sampling process technically and operationally?
- Forums
- ASX - By Stock
- What’s the plan if the sidetrack fails?
Which is why it may have been optimal to drill and wireline...
-
- There are more pages in this discussion • 30 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add IVZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
6.8¢ |
Change
-0.001(1.45%) |
Mkt cap ! $96.41M |
Open | High | Low | Value | Volume |
7.0¢ | 7.0¢ | 6.8¢ | $59.36K | 861.7K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
6 | 290682 | 6.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
6.9¢ | 344468 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
6 | 290682 | 0.068 |
7 | 592333 | 0.067 |
9 | 372300 | 0.066 |
6 | 261940 | 0.065 |
4 | 533890 | 0.064 |
Price($) | Vol. | No. |
---|---|---|
0.069 | 344468 | 1 |
0.070 | 70134 | 4 |
0.071 | 306757 | 1 |
0.072 | 362120 | 5 |
0.075 | 250000 | 1 |
Last trade - 16.10pm 07/05/2024 (20 minute delay) ? |
|
|||||
Last
6.9¢ |
  |
Change
-0.001 ( 0.43 %) |
|||
Open | High | Low | Volume | ||
6.9¢ | 7.0¢ | 6.8¢ | 597937 | ||
Last updated 15.51pm 07/05/2024 ? |
Featured News
IVZ (ASX) Chart |
The Watchlist
HAR
HARANGA RESOURCES LIMITED.
Peter Batten, MD
Peter Batten
MD
Previous Video
Next Video
SPONSORED BY The Market Online