Hand held XRF used to estimate average grade of boulder at 29%! In direct contradiction of the Competent Person Statement on XRF. But hey, there's a water bottle ....
And the cabling/electrics was not the last thing to be done. Still no tank farm or piping to the gennies, or even the contrat for it. Still got valves to be installed (valves are not usually part of an electrical installation) and of course 450km of cabling.
Nothing on the finance. Lot's of photos.
Laughable.
CDU Price at posting:
$1.41 Sentiment: Sell Disclosure: Not Held