Ok john435, I looked at last years announcements and could only find .... "The RC rig is currently at the Tiger prospect however difficult ground conditions have resulted in very slow progress and the holes have encountered excessive water flows that are associated with highly fractured zones, often containing large cavities. Additional air capacity has been brought in but has not helped to improve the drilling progress."
Firstly, we don't know that this is happening. It is only conjecture. Secondly, weren't they going down an existing RC hole to use as a pre-collar for subsequent deeper diamond drilling (or have I got it wrong). Surely, that deep, we have moved beyond water flows?
Lastly I refer again to the "vibes" of the call I received last week, reiterating their focus on delivering results by 30 June.
- Forums
- ASX - By Stock
- GBZ
- what does it all mean?
what does it all mean?, page-31
-
- There are more pages in this discussion • 5 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GBZ (ASX) to my watchlist
(20min delay)
|
|||||
Last
0.9¢ |
Change
0.000(0.00%) |
Mkt cap ! $10.41M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 3723912 | 0.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.9¢ | 300000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 3723912 | 0.008 |
8 | 5161552 | 0.007 |
1 | 250000 | 0.006 |
3 | 2400690 | 0.005 |
1 | 500000 | 0.004 |
Price($) | Vol. | No. |
---|---|---|
0.009 | 300000 | 1 |
0.010 | 2093334 | 3 |
0.011 | 2600000 | 2 |
0.012 | 504350 | 2 |
0.013 | 764369 | 4 |
Last trade - 09.03am 01/10/2024 (20 minute delay) ? |
Featured News
GBZ (ASX) Chart |
Day chart unavailable
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
Previous Video
Next Video
SPONSORED BY The Market Online