8000 bbl/day constrained by 4 1/2"tubing, SS riser with SS test tree and flow tree to manifolds, rig torturous piping and limited flow well test separator to burner boom oil burner heads and gas flare tip.
Remove rig, SS riser and install 5 1/2" completion SS Xmas tree and manifold hooked up to FPSO or SS pipelines with unconsyrained process hook up = ~ 18,000 bbl/day AV per/well per/day.
Run those calcs because that's what is being done with the data now the well test is over it's into FEED and development planning phase in case you forget or didn't know about the jobs being advertised or being filled with COP staff.
Might even think about it myself I love Edinburgh especially during the festival month.
- Forums
- ASX - By Stock
- What does it all mean?
8000 bbl/day constrained by 4 1/2"tubing, SS riser with SS test...
-
- There are more pages in this discussion • 80 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FAR (ASX) to my watchlist
(20min delay)
|
|||||
Last
48.5¢ |
Change
-0.010(2.02%) |
Mkt cap ! $44.81M |
Open | High | Low | Value | Volume |
49.0¢ | 49.8¢ | 48.5¢ | $170.0K | 347.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 83716 | 48.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
49.0¢ | 25472 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 83716 | 0.485 |
2 | 110000 | 0.480 |
1 | 100000 | 0.475 |
1 | 100000 | 0.470 |
1 | 50000 | 0.425 |
Price($) | Vol. | No. |
---|---|---|
0.490 | 25472 | 2 |
0.510 | 222895 | 5 |
0.515 | 103300 | 2 |
0.520 | 421965 | 4 |
0.525 | 100000 | 1 |
Last trade - 16.10pm 09/09/2024 (20 minute delay) ? |
Featured News
FAR (ASX) Chart |