they need to scrape 2mmf/d in order to connect to pipeline
1.5 to go from the zones to be tested. My guestimate (very wild and optimistic fingers crossed guess) is that Upper Ismay is the best prospect for at least 1mm and this is based upon other wells in the Paradox