cut out all this crap chat.
I spoke to a #E Siesmic guy and I found out everything CTP would have need to know in 15 seconds. Here it is
100 sq km @ 25,000/km
mobilisation $500,000
total cost about $3,000,000M for 100 sq km.
essential to do 3D because need anti-clinal structures unfortunately echelon fractures are a problem, usually on a 500 m spacing more or less depending on rock properties.
(Imagine an underground ridge - where oil collects and where rock fractures are opened up - chopped up like salami into 500 m sections and then each piece translated horizontally)
Therefore, need 3D and can guarantee where to drill to get maximum value and flow from drilling.
I found that out in 15 seconds. So what the (expletive) are they doing?
- Forums
- ASX - By Stock
- CTP
- what has been done since 13 january
what has been done since 13 january, page-14
-
- There are more pages in this discussion • 50 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
LKE
Lake Resources implies news article on job cuts made up; non-core sales "not material" and no rule 15.7 breach
IGO
IGO kicks off earn-in copper drilling on-site Encounter's Yeneena play as it adopts new identity
Add CTP (ASX) to my watchlist
|
|||||
Last
4.9¢ |
Change
0.001(2.08%) |
Mkt cap ! $36.26M |
Open | High | Low | Value | Volume |
4.9¢ | 4.9¢ | 4.9¢ | $2K | 40.81K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 993652 | 4.8¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
4.9¢ | 189266 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 993652 | 0.048 |
1 | 200000 | 0.047 |
1 | 100000 | 0.046 |
4 | 539092 | 0.045 |
2 | 190000 | 0.042 |
Price($) | Vol. | No. |
---|---|---|
0.049 | 189266 | 2 |
0.050 | 110000 | 2 |
0.054 | 22956 | 1 |
0.055 | 461000 | 2 |
0.056 | 178589 | 1 |
Last trade - 10.02am 26/07/2024 (20 minute delay) ? |
Featured News
CTP (ASX) Chart |