Area of RDN's Andover South and North is 40 sqkm. They focus on Andover south which is less than 20 sqkm and contains 2 unconnected blocks. Each block is around 10 sqkm. Is that big enough if they find lithium underground? Maybe small MRE. They also need lands to build spodumere concentrate plant, waste plant and staff camp.