from a premier release on the 19th nov
Following the successful Cá Rong Do discovery in June 2009 and subsequent acquisition of 3D seismic data over the eastern side of the block, the second Premier-operated well on Block 07/03 is due to spud imminently.
are they being closed lipped or are they still trying to spud ?
hopefully all will be clarified this week as i hope the 5% farm in as well.
Add to My Watchlist
What is My Watchlist?