NRZ 0.00% 1.3¢ neurizer ltd

if you look at this table. Depththickness of seamvolume. If if...

  1. 104 Posts.
    lightbulb Created with Sketch. 14

    if you look at this table.
    Depth
    thickness of seam
    volume.

    If if you were to start your PCD somewhere, whichsection would you put it in?
    me...... I would be choosing section Q1, Q2, Q3.
    That is roughly 2/3rds of total volume present in this project.
    Question for the knowledgeable
    does the upgrade information rely on results of coal testing directly around PCD, or are drill results such as these used as well.?
    If the PCD is in Q1,2,3 does that allow the whole 239 Mt to be included in the upgrade, as the coal at the 3 sections share the same particulars?
    https://hotcopper.com.au/data/attachments/1464/1464403-bc06909d415ad7d06d334061014f4356.jpg
 
watchlist Created with Sketch. Add NRZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.