Windows and door frames are installed during brickwork currently because it makes it easy to ensure that the opening is the correct size?
if the opening size could be guaranteed to be within 1mm, is this something that could change?
Could the design of the windows frames be altered such that they can be installed afterwards?
wouldn't this be better for renovating in 30byears times when someone decides that they want timber windows frames with triple glazed glass instead of mission brown extruded aliminium frames?
- Forums
- ASX - By Stock
- What is Mike Pivac Doing? Something? Anything?
Windows and door frames are installed during brickwork currently...
-
- There are more pages in this discussion • 423 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add FBR (ASX) to my watchlist
|
|||||
Last
4.8¢ |
Change
0.000(0.00%) |
Mkt cap ! $214.1M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 28867 | 5.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
3.7¢ | 503546 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 28867 | 0.053 |
1 | 150000 | 0.051 |
4 | 462400 | 0.050 |
2 | 51448 | 0.049 |
10 | 695374 | 0.048 |
Price($) | Vol. | No. |
---|---|---|
0.037 | 503546 | 1 |
0.043 | 75000 | 1 |
0.047 | 460000 | 1 |
0.048 | 100000 | 1 |
0.049 | 100000 | 1 |
Last trade - 16.16pm 02/08/2024 (20 minute delay) ? |
Featured News
FBR (ASX) Chart |
Day chart unavailable