Let's get back on track......
The last ann. for RGN-1 included a four point Plan/Next steps...
Three of those points occurred as a matter of course and are of no consequence,
which leaves point 4...
Review pressure, sample and flow rate data recovered from the well, perform reserve analysis and commerciality study of the RGN-1 well
Anyone have any idea how long this is likely to take?
Add to My Watchlist
What is My Watchlist?