EM2 0.00% 5.0¢ eagle mountain mining limited

EM2 has a significant "wall of worry" to overcome, both at a...

  1. 3,863 Posts.
    lightbulb Created with Sketch. 1837
    EM2 has a significant "wall of worry" to overcome, both at a company and a macro level, before we will see a march north I suspect.

    1. Slow reporting of drilling results
    2. Waiting on the results of a feasibility study
    3. Waiting on permits to drill new areas

    The company has demonstrated that there is plenty of copper there, at good grades, with high grades of silver as a secondary resource. Without a feasibility study, it is not possible to determine the profitability of the mine at different copper prices, how much money is needed to develop the required infrastructure and therefore place a value on the project. No major will be placing an offer on the table until those questions are answered.

    The feas study is the lynchpin to all of this IMO.


 
watchlist Created with Sketch. Add EM2 (ASX) to my watchlist
(20min delay)
Last
5.0¢
Change
0.000(0.00%)
Mkt cap ! $19.64M
Open High Low Value Volume
0.0¢ 0.0¢ 0.0¢ $0 0

Buyers (Bids)

No. Vol. Price($)
1 925 5.4¢
 

Sellers (Offers)

Price($) Vol. No.
5.5¢ 32606 1
View Market Depth
Last trade - 11.00am 08/08/2024 (20 minute delay) ?
EM2 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.