72- have a day job can look at this tonight. fairly basic but the cost of construction is about $1200 per MW for gas and $1700 for coal, plus the gold fields gas pipe line share, plus the Alinta retail. Using these numbers you get close to $1.3 billion as per BBP presntation in FEB.
Assets are good but power generation is a commodity , some are on long term contracts but peak demand and power prices do vary greatly unlike other infrastructure type assets.
Problem is BNB debt and ICR.
- Forums
- ASX - By Stock
- what the week going to be like for bbp ?
72- have a day job can look at this tonight. fairly basic but...
-
- There are more pages in this discussion • 6 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)