AFT 0.00% 0.1¢ afg 2023-1 trust in respect of series 2023-1

What The!!, page-14

  1. 1,895 Posts.
    lightbulb Created with Sketch. 7
    Example: GA Demonstration Project in China • Project name: Phase I, EFG Panyu Industrial Park Limited; • Project size: 100kw roof top grid-connected solar energy system; • Daily Electricity Production; 253kwh/day; • Est. Greenhouse CO2 Saving: 243 ton/year; • Project leasing period: 10 years • Project funding: A$ 350k fully funded by GRI; • Project Leased at 16% P.A; • Fixed Amortization a$598/month. • An opportunity to be expanded to a 2 MW MSPP on Phase II.
 
watchlist Created with Sketch. Add AFT (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.