3 months one day, maybe 6 the next, sure is a test of patience
from AGM.
================
"Our target with current progress is to be connected into a major gas pipeline in 3 months"
from neo website
=============
"How long will it take to get gas flowing in the pipeline and what are the limiting factors?
If the testing on our gas wells now goes well we will have gas flowing into a gas line in three to six months from now (May 06). "
- Forums
- ASX - By Stock
- what to believe
NEO
nuenco nl
3 months one day, maybe 6 the next, sure is a test of...
-
- There are more pages in this discussion • 18 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)