re: announcement bmg ramp up ASX/MEDIA RELEASE
8 January 2007
BASKER MANTA COMMISSIONING
PRODUCTION FROM GIPPSLAND BASIN PROJECT
The Basker Manta Project commissioning continues with oil production having started from all 4 wells, Manta 2A, Basker 2, 3 and 5, and the compressor having been fully commissioned with gas being reinjected into Basker 4.
A maximum oil rate of 13500 bopd was achieved yesterday, and today, rates are being ramped up to the planned levels of 25,000 bopd, with all associated gas injected into Basker 4 at up to 35 MMscfd. Total production to date since 17 December, when commissioning commenced, is 135,000 barrels.
The participants in the Basker-Manta Joint Venture are:
Anzon Australia Limited 50% (Operator)
Beach Petroleum Limited 50%
Andrew A. Young
Executive Director/COO
Sydney, Australia
- Forums
- ASX - By Stock
- BPT
- what
what , page-13
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BPT (ASX) to my watchlist
(20min delay)
|
|||||
Last
$1.54 |
Change
0.015(0.99%) |
Mkt cap ! $3.501B |
Open | High | Low | Value | Volume |
$1.51 | $1.55 | $1.50 | $10.73M | 7.023M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 25391 | $1.53 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.54 | 39714 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
7 | 168962 | 1.525 |
7 | 125457 | 1.520 |
4 | 85870 | 1.515 |
2 | 23172 | 1.510 |
2 | 19909 | 1.505 |
Price($) | Vol. | No. |
---|---|---|
1.535 | 13326 | 1 |
1.540 | 128659 | 8 |
1.545 | 149338 | 4 |
1.550 | 245318 | 11 |
1.555 | 155086 | 3 |
Last trade - 16.10pm 12/07/2024 (20 minute delay) ? |
Featured News
BPT (ASX) Chart |