This email received by me from CFR on 29/6/04 in response to query on Copeton shaft.
Hope this helps
Bendigo
Thank you for your inquiry.
The rate at which the contractor is able to sink the shaft depends directly upon the nature of the rock they have to dig through: we are unable to give you an accurate answer as a result, however we anticipate that shaft works should be completed within two months