my take on all this. the zn pb operation is a no go at these prices. the long term outlook is not good for either commodity.
cu on the other hand *MIGHT* be profitable. however since last prefeas the costs of mining have gone up a great deal, and the cu price is now in a long term down trend back to historical averages.
all doesnt bode well for copperstrike. I expect from what i have been advised is that the feas study will say its a good project but can never get off the ground at these prices and grades.
- Forums
- ASX - By Stock
- whats going on
my take on all this. the zn pb operation is a no go at these...
Featured News
Add CSE (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $20.80M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
CSE (ASX) Chart |
Day chart unavailable
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online