Is it significant that the latest update from WGP does not even mention Riddle #13?
The last Riddle #13 announcement was 16/10, so with this latest update, there is no new news on R#13? Seems strange to me. Could R#13 have been overlooked or is there perhaps more to this?
In the 16/10 announcement several more drilling permits were being sought for the Riddle field and the time frame was 3 weeks. It is now over 4 weeks and no update on those permits or Riddle #13.
Is it me or can something be read into this oversight?
WGP Price at posting:
0.0¢ Sentiment: Hold Disclosure: Held