AUZ 14.3% 0.8¢ australian mines limited

Drifta , From the June 27 ann it states 50,000m resource drill...

  1. 1,447 Posts.
    lightbulb Created with Sketch. 688
    Drifta , From the June 27 ann it states 50,000m resource drill program commenced.I believe there are 2 RC rigs on site. In a perfect world they could drill 50,000m in around 3 months or so dependant on ground conditions ,clays & aquifers,bogged rods ,mechanical break downs and weather delays etc. The samples have to go to lab for testing QA/QC and then the results delivered for JORC 2012 resource upgrade. For total resource upgrade this could be a 4-6 month process?? That is also the reason that the current BFS wont have these results to get it over the line as some conspirators on here have been banging on about!! IMO

    AUZ drilling.JPG
    AUZ RC rig.JPG
  2. This thread is closed.

    You may not reply to this discussion at this time.

 
watchlist Created with Sketch. Add AUZ (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.