We are maybe half way through our current waiting period.
When the rig turns up at TC my understanding is that if the Ellenburger horizontal is all good and the have commercial flow rates, then the current well will be finished as a production well. Then to test the Canyon Sands and the unconventional resoirvour a new well will have to be drilled.
Is this correct?
Saltbus
Ps. Gas showed some sign of life and has popped over $4.00 for the first time since someone butted in and posted similar a couple of weeks ago and stole my thunder.
- Forums
- ASX - By Stock
- what's next
We are maybe half way through our current waiting period. When...
-
- There are more pages in this discussion • 28 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CEL (ASX) to my watchlist
|
|||||
Last
5.6¢ |
Change
0.001(1.82%) |
Mkt cap ! $77.90M |
Open | High | Low | Value | Volume |
5.5¢ | 5.8¢ | 5.5¢ | $95.99K | 1.710M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 100000 | 5.6¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.8¢ | 358780 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 750000 | 0.054 |
2 | 1120000 | 0.053 |
4 | 667300 | 0.052 |
4 | 247000 | 0.051 |
3 | 420000 | 0.050 |
Price($) | Vol. | No. |
---|---|---|
0.058 | 358780 | 3 |
0.059 | 100000 | 1 |
0.060 | 350000 | 1 |
0.061 | 60000 | 1 |
0.063 | 194817 | 2 |
Last trade - 15.45pm 28/06/2024 (20 minute delay) ? |
Featured News
CEL (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online