PM8 0.00% $1.66 pensana plc

What's to like about Pensana??, page-24

  1. 2,901 Posts.
    lightbulb Created with Sketch. 746
    Lacking in understanding or research again as thru the ASX JORC Compliant



    Table 1: Longonjo Mineral Resource estimate, Total, at 0.1% NdPr lower grade cut
    Mineral Resource
    estimate category
    Tonnes
    (million)
    REO grade
    (%)
    NdPr grade
    (%)
    Contained
    REO
    (Tonnes)
    Contained
    NdPr
    (Tonnes)
    Measured 25.7 2.58 0.55 664,000 141,000
    Indicated 165 1.51 0.33 2,490,000 536,000
    Inferred 123 1.08 0.25 1,320,000 313,000
    Total: 313 1.43 0.32 4,470,000 990,000
    REO includes NdPr. Figures may not sum due to rounding. See Table 7 for average distribution of individual
    REOs.
    The revised Mineral Resource estimate incorporates data from the 195 hole, 7,987
    metre infill and extension reverse circulation drilling programme completed in
    2020. The drilling was in support of Bankable Feasibility Studies with the objective
    of extending the nine-year mine life of the Preliminary Feasibility Study (ASX 15
    November 2019) by converting substantial amounts of Inferred category resource
    to Indicated and Measured, which may then be included in the mine schedule on
    completion of the current Bankable Feasibility Study work programmes.
    Further breakdowns of the Measured, Indicated and Inferred Mineral Resource
    estimate are reported in Tables 4 to 6 in the Appendix for the Total, Weathered
    and Fresh Rock mineralisation at a range of NdPr cut-off grades. Data and
    estimation criteria used in the estimates are detailed in the Material Information
    Summary and in JORC Code (2012) Sections 1, 2 and 3 in the Appendix.

    https://pensana.co.uk/wp-content/uploads/2020/09/longonjo-mineral-resource-estimate-upgraded-14-Sept-2020.pdf

 
watchlist Created with Sketch. Add PM8 (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.