I wish to know how likely it will be for a coal JORC before year end?
Does anybody know that how many holes need to be drilled before you can report a JORC complied resource? How long will it take to drill that number of holes? And how long, generally speaking, will a company get the full result from the lab after finishing all the required drilling and sending the samples to the lab?
I have read the whole "JORC Code 2004 Edition" a few times, but there seems to be no such specific figure on it.
Could anyone help? Many thanks in advance.
Cheers
MNM Price at posting:
0.0¢ Sentiment: None Disclosure: Held