He has been a disgrace.
Wasted $1B not building a road, still carrying the DeSal Plant, nth/Sth Water pipe blah blah blah
His Nth/East Link or whatever the fark it is - won't sign a contract until after the next election, that is because a contract won't be ready until after the next election.
I think they should build both (East/West Link and Nth/East link) just build the bloody things, there are more and more cars on the road everyday in Melbourne.
- Forums
- Political Debate
- when should Daniel Andrews RESIGN
when should Daniel Andrews RESIGN, page-2
-
- There are more pages in this discussion • 23 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Featured News
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online