when should Daniel Andrews RESIGN, page-2

  1. 9,974 Posts.
    lightbulb Created with Sketch. 59
    He has been a disgrace.

    Wasted $1B not building a road, still carrying the DeSal Plant, nth/Sth Water pipe blah blah blah

    His Nth/East Link or whatever the fark it is - won't sign a contract until after the next election, that is because a contract won't be ready until after the next election.

    I think they should build both (East/West Link and Nth/East link) just build the bloody things, there are more and more cars on the road everyday in Melbourne.
    Last edited by The Ace: 27/02/17
 
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.