He has been a disgrace.
Wasted $1B not building a road, still carrying the DeSal Plant, nth/Sth Water pipe blah blah blah
His Nth/East Link or whatever the fark it is - won't sign a contract until after the next election, that is because a contract won't be ready until after the next election.
I think they should build both (East/West Link and Nth/East link) just build the bloody things, there are more and more cars on the road everyday in Melbourne.
- Forums
- Political Debate
- when should Daniel Andrews RESIGN
when should Daniel Andrews RESIGN, page-2
Featured News
Featured News
The Watchlist
CCO
THE CALMER CO INTERNATIONAL LIMITED
Matthew Kowal / Andy Burger, CCO / Head of E-Commerce
Matthew Kowal / Andy Burger
CCO / Head of E-Commerce
SPONSORED BY The Market Online