GRR 3.64% 26.5¢ grange resources limited.

When the boat comes in???, page-1581

  1. 6,314 Posts.
    lightbulb Created with Sketch. 1285
    Thanks miningnut, always look forward to your shipping updates. A question, doe this next arrival in Decemeber indicate that the conveyor replacement will have been done ? I note that there is an approx 3 week interval between the last vessel in November and the next in December so I'm wondering if that was planned to give sufficient time to get the conveyor replaced. Hope so, anyway.
 
watchlist Created with Sketch. Add GRR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.