TD = ~3800m from rig platform, Minus water depth of ~ 400m = ~3400m of drilling = approx 21 days of drilling. The first 1000m will take 3-4days, but will get slower as the drill bit get lower into earths crust, will also be 3 casings down to 12".
- Forums
- ASX - Short Term Trading
- when will the honey hit the fan?
TD = ~3800m from rig platform, Minus water depth of ~ 400m =...
-
- There are more pages in this discussion • 2 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)