NDO 0.59% 85.5¢ nido education limited

when?

  1. 1,012 Posts.
    Just looked at timing - given last update and a range of likely timing it appears that the earliest that we will drill into the secondary target is:

    Earliest - Tuesday PM (today)
    Latest - Wednedsay PM/Thursday AM

    This assumes no downtime, typical BOP running and testing timing, max/min average ROP (inc connections) of 20/15 m/hr and a single bit drills to top Coron Clastics.

    So, maybe we don't have to wait until Thursday.

    p1000
 
watchlist Created with Sketch. Add NDO (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.