SI6 0.00% 0.2¢ si6 metals limited

Where are the results?

  1. 6,072 Posts.
    I thought Micky would love the headline

    4 August 2014

    Holes 9 – 12 (MARD0065 to 68)
    Holes 9 – 12 have been designed to test the shallow, up-dip extents of the Maibele North
    orebody to assess the potential for open pit operations. All holes have been pre-collared and
    are awaiting the arrival of the diamond drill for completion.

    Holes 9 - 12 were to be drilled to 100m in depth and they were already pre-collared.   I would think any day now the results be in.
    Considering they drilled over 1,100m for first 8 holes over a 7 week period I can't imagine that it takes this long to drill 4-5 holes that have already been pre-collared and are half the drill depths?  Almost 3 weeks since an update on drilling...............very strange.

    Looks to me there is some sort of agenda being set since the last drill update on 4 August.

    Also looks like someone wants the share price at around 2.6 regardless of the dumps every now and then into 2.5 and 2.4 but that can change at anytime I guess.

    Just thinking.
 
watchlist Created with Sketch. Add SI6 (ASX) to my watchlist
(20min delay)
Last
0.2¢
Change
0.000(0.00%)
Mkt cap ! $4.150M
Open High Low Value Volume
0.2¢ 0.2¢ 0.2¢ $1.04K 520.7K

Buyers (Bids)

No. Vol. Price($)
52 86852223 0.1¢
 

Sellers (Offers)

Price($) Vol. No.
0.2¢ 55387792 24
View Market Depth
Last trade - 10.09am 08/11/2024 (20 minute delay) ?
SI6 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.